Maximum drilling depth: 1600 m
Drilling diameter: 127–700 mm
Working air pressure: 1.65–8 MPa
Air consumption: 16–120 m³/min
Drill pipe length: 3–6 m
Drill pipe diameter: 114 / 127 / 140 mm
Thrust force: 20 T
Lifting force: 60 T
Maximum drilling depth: 1000 m
Drilling diameter: 150–600 mm
Working air pressure: 1.05–4.5 MPa
Air consumption: 16–100 m³/min
Drill pipe length: 3 m, 4.5 m, 6 m
Drill pipe diameter: 102 / 114 / 127 mm
Thrust force: 20 T
Lifting force: 48 T
Maximum drilling depth: 200m
Drilling diameter: 90-254mm
Engine: Yunnei 55KW
Maximum drilling depth: 220m
Drilling diameter: 90-315mm
Engine: Yunnei 65KW
Maximum drilling depth: 260m
Drilling diameter: 90-305mm
Engine: Yuchai 77KW
Maximum drilling depth: 300m
Drilling diameter: 105-325mm
Engine: 85 or 91KW
Maximum drilling depth: 350m
Drilling diameter: 105-325mm
Engine: Yuchai 91kw
Maximum drilling depth: 400m
Drilling diameter: 105-350mm
Working wind pressure: 1.05-3.45Mpa
Maximum drilling depth: 500m
Drilling diameter: 105-350mm
Working wind pressure: 1.05-4.5Mpa
Maximum drilling depth: 600-700m
Drilling diameter: 105-500mm
Working wind pressure: 1.05-4.5Mpa