The rig you inspected and the rig that clears your port are the same machine only if the paperwork matches. We keep the configuration sheet, test report and packing list in one buyer file, because export problems rarely start at the factory gate. They start with a model name on a quotation that nobody translated into a shipping specification.
We are Shijiazhuang Zhengdrilling Machinery Equipment Co., Ltd., and we export drilling equipment to Central Asia, the Middle East, Russia, South America, North America, Africa and Southeast Asia. Published figures for the ZD-2000 and our truck-mounted range give you a starting point. This checklist covers the documents and decisions you should settle before the deposit, not after production.

A borehole drilling machine is a mobile plant: mast, head, hoist, power unit and circulation equipment on one frame. The ZD-2000 uses a crawler frame and a 6.6 metre mast stroke. Truck-mounted rigs put the same functions on an established heavy-truck chassis with hydraulic legs. Both need a defined configuration before shipment.
The head turns the string while the hoist manages weight and pull. Circulation clears the hole: mud for loose layers, air for hammer work. The ZD-2000 crawler rig is published for reverse circulation in loose layers and reverse bedrock. Your method determines which pumps, compressors and pipe the shipment must include.
Put the configuration sheet, test report and packing list in one buyer file. Date every revision. When a question arrives later, you can answer from the file instead of tracing emails. That matters on deep-well machines, where options change the shipment.
Most delays come from a mismatch between paper and cargo. A packing list that omits a generator or pump raises questions at inspection. Write dimensions and included equipment as they will be loaded. We would rather correct a line before dispatch.
Wear items are method-specific. Hammer bits, seals and drill pipe threads differ between configurations. Record the serial number and the pipe specification on the same sheet. Ordering from memory is how a machine sits idle for a week.
A rig rated for a deep well can arrive without the air or mud package the formation needs. Decide the method first, then list supporting equipment. Confirm the engine and generator arrangement in writing. Modifying a shipped machine overseas is expensive.
The ZD-2000 publishes 2000 metres in its standard version, a 500 mm hole and reverse circulation. It can be configured from 150 to 2000 metres with a design and production proposal. State the configuration you ordered on the first page of the buyer file.
Published figures include 100 T lifting force, 38000 N·m torque and 120–440 rpm for the ZD-2000. Travel is 2.5 km/h and gradeability 21°. Put these in the contract with test conditions. A number without conditions is hard to defend.
The ZD-2000 uses 3 × 6 metre pipe at 102, 114 or 127 mm. Across our drill tools, pipe runs from Φ50 to Φ127 mm. Our drill pipe range covers several thread and diameter combinations. Confirm the exact thread and length before the parts order goes in.
The ZD-2000 measures 6800 × 2500 × 3000 mm and weighs 21 t. Truck rigs publish different weights: T-400/500/600 at 9.5, 10.5 and 13.5 t; T-700/1000/1200 at 14, 26 and 23 t. Confirm transport dimensions in writing.
The ZD-2000 is published with a 410 kW engine. Truck rigs offer independent hydraulic cooling and a high-strength frame and mast. Options include mud pump, generator, foam pump, welding machine and compressor. Mark each option as included or excluded on the configuration sheet.
| Published transport and weight figures | |||
| Machine | Transport size | Published weight | Published depth |
|---|---|---|---|
| ZD-2000 | 6800×2500×3000 mm | 21 t | 2000 m standard |
| T-400/500/600 | to be confirmed in writing | 9.5 / 10.5 / 13.5 t | 400 / 500 / 600 m |
| T-700/1000/1200 | to be confirmed in writing | 14 / 26 / 23 t | 700 / 1000 / 1200 m |
Crawlers suit rough ground and heavy strings. The ZD-2000 combines a 2000 metre rating with reverse circulation and rubber tracks. Its 38000 N·m torque and 100 T lifting force are published. Ask which figures apply to your configuration.
Our truck-mounted drilling rigs cover 200 to 2000 metres and switch between mud and air drilling. Chassis options are established heavy-truck platforms. Choose the frame by route and payload, then confirm the exact dimensions before booking transport.
A deep well needs the right bits, hammer and pipe from day one. Our drill tools cover PDC bits, tricone bits, DTH hammers and high-pressure air and mud pipe. Pack a wear-item set with the machine. List every item on the packing list so customs sees the same story.
Many deep wells serve villages and farms rather than cities. The machine must reach the site through narrow roads and work without a permanent pad. Confirm the frame width and the turning space. Delivery training helps the local crew start without delay.
Geothermal bores and foundation water holes need documentation as much as depth. Record the method, the pipe and the pump settings in the same file. Our rigs are listed for shallow geothermal and municipal foundation water exploration. Keep the test report with the handover papers.
Remote sites make every missing part expensive. Send the spare-part list with the machine and identify wear items by serial number. Our recorded project regions include Africa and South America, where logistics planning starts early. Confirm the parts pack before dispatch.
A deep hole may pass loose layers and bedrock in one string. The ZD-2000 is published for loose layers and reverse bedrock layers. Match the circulation method to that profile. Changes made after shipment are slow and costly.
A factory-gate purchase looks cheaper because it stops at the machine. An export purchase includes documents, packing, spares and a handover plan. The table sets the two approaches side by side across the items that matter once the rig leaves our site.
| Factory-gate purchase against a documented export pack | |||
| Item | Factory-gate purchase | Documented export pack | Buyer check |
|---|---|---|---|
| Configuration | Model name only | Sheet with every option | Sign the sheet before production |
| Documents | Test report on request | Report; packing list; serial numbers | Match numbers on arrival |
| Wear items | Ordered later | Included in the shipping list | Confirm bit and pipe sizes |
| Handover | Buyer arranges | Delivery training and on-site service | Put the date in the contract |
We are not describing a free upgrade. Each line in the right column is a decision made earlier rather than later. That is the whole advantage. A documented pack costs attention before shipment and saves time at the port.
Write the target depth, finished diameter, casing and method on one page. That page becomes the configuration sheet. If a supplier cannot quote against it, the answer will be a model name rather than a machine. We quote against the well design.
Measure the road, the bridge and the gate before you choose a chassis. A crawler handles soft ground but moves slowly between sites. A truck covers distance but needs a road and a load permit. Neither is better in the abstract.
State the engine, generator and voltage arrangement you expect. Confirm what the machine ships with and what you provide locally. Our published figures name engine power, but site electrical needs should be confirmed in writing. Guessing here causes commissioning delays.
List the wear items you expect to change in the first season: bits, seals, pipe joints and filters. Ask for part numbers tied to the serial number. Our service includes spare-part supply and vehicle maintenance. Start the parts file at order stage.
Tell us which documents you need and in what format before production. Include the packing list, test report and configuration sheet. We keep them in one buyer file. A clean file at shipment saves more time than a discount negotiated at order stage.
Confirm the unloading method and the ground it will stand on. A 21 t crawler needs a firm pad. Check overhead lines before the mast rises. Mark the working area for the circulation equipment and the pipe rack.
Level the frame first, then raise the mast. Position the mud pit or compressor so the return path is short. Connect the power and cooling systems as specified. Recheck levels after the first pipe is added.
Our service includes delivery training, on-site service and free spot checks. Use the session to run the machine through its normal sequence. Record any difference from the configuration sheet on the day. A signed record is easier to resolve than a later claim.
A lower rig price can hide a missing compressor or pump. List the whole spread before you compare quotes. Include tooling, spares and documents. The machine that arrives complete is the one that starts drilling.
Put depth, diameter, lifting force, weight and transport size in one sheet. Our factory overview shows the design and production work behind standard and custom machines. Use it to frame questions, not to replace written specifications.
Packing method, exact lead time and some component details are not public. Mark them to be confirmed in writing. We will not invent a figure for a page. A clear gap is safer than a confident guess.
Send your questions to one contact and keep the replies together. Our team handles pre-sale technical consultation and after-sale service. Our service page lists delivery training, on-site support and spare-part supply. Use it before you need it.
We publish the numbers a buyer can check: 2000 metres, 500 mm, 100 T lifting force and 6800 × 2500 × 3000 mm transport size on the ZD-2000. Where a detail is not public, we mark it to be confirmed in writing. Our export markets span several continents, and we write configurations down before production.
We ask for the document format with the first enquiry. That lets us put the test report, packing list and configuration sheet in one file from the start. Our service covers delivery training, on-site work and spare parts. Send the well design and we will tell you what ships and what stays on your side.
The configuration sheet, test report format, packing list and serial-number record. Agree who signs each one and when you receive it. These items define the machine you are buying. Everything else can be clarified later, but these four should be fixed first.
Ask for the shipping dimensions of the exact configuration, not the model family. Published weights vary across our T-series. Put the confirmed length, width, height and weight in the contract before you book freight.
The ZD-2000 uses 3 × 6 metre pipe at 102, 114 or 127 mm. Our wider drill tools range runs from Φ50 to Φ127 mm. Confirm the thread and diameter you need before ordering. Spare pipe bought to the wrong thread is expensive dead stock.
Tell us the voltage and frequency you expect and what the site can provide. Published engine and generator figures are a starting point. Any change to the electrical arrangement should be confirmed in writing before production.
Our service includes spare-part supply, on-site service and vehicle maintenance. Send the serial number and part description together. An up-to-date buyer file makes identification quick. We would rather solve the issue than debate paperwork.
Processing Demand Survey
x